Click image to view full-size pdf. |
In-Person Open House Workshop
Thursday, March 10, 2022 from 6:00 to 7:30pm
AMC North DeKalb 16, 2042 Lawrenceville Hwy, Decatur, GA 30033
Join Commissioners Jeff Rader and Ted Terry, the DeKalb County Transportation Department, and the PATH Foundation on a trail study to extend the South Peachtree Creek Trail.
The northern study area will focus on connectivity with the greenway trail and street calming between North Druid Hills Road and the existing/planned North Fork Peachtree Creek Greenway.
The southern study area is from Medlock Park to the N. DeKalb Mall redevelopment area, with spur connection to Laurel Ridge Elementary School and the Little Creek Horse Farm.
The workshop will collect input for potential trail destinations, preferred types of trail, and desired trail connections for both study areas. Workshop stations will be organized to promote social distancing and masks are strongly encouraged.
The workshop is being facilitated by KaizenCollaborative.
The maps below show a clearer views of the existing South Peachtree Creek PATH and existing/planned Peachtree Greenway.
South Peachtree Creek Trail in red. via https://ridewithgps.com/routes/35894934 |
Peachtree Creek Greenway (existing and proposed) interactive map, with the Medlock Park area and North DeKalb Mall visible at the bottom center of the map. |